• Sonuç bulunamadı

BMT202 MESLEKİ YABANCI DİL 2 12.HAFTA

N/A
N/A
Protected

Academic year: 2021

Share "BMT202 MESLEKİ YABANCI DİL 2 12.HAFTA"

Copied!
8
0
0

Yükleniyor.... (view fulltext now)

Tam metin

(1)

BMT202 MESLEKİ

YABANCI DİL 2

12.HAFTA

GAMA MESLEK YÜKSEKOKULU

ÖĞR.GÖR.MEHMET DURSUN

(2)

Verification of Pneumatic System

………

The following tests, from Basic Pneumatic Leakage Test on page 19 through Over-Pressure on

………

page 23, verify the functionality of the pneumatic system of the monitor.

………

All these tests, with the exception of the Basic Pneumatic Leakage Test, require the use of an

………

(3)

………

Although the tests were designed to use the Bio-Tek BP Pump noninvasive blood pressure

………

simulator, any equivalent NiBP simulator with the same internal test volume can be used.

………

The internal test volume of the Bio-Tek simulator is 250 ml.

………

(4)

………

the NiBP tests.

………

For a detailed explanation of the Diagnostic Mode, refer to Chapter 4, Power-up Defaults

………

Menu And Diagnostic Mode .

………

Basic Pneumatic

(5)

Leakage Test

………

The purpose of this test is to verify the integrity of the NiBP Pneumatic System after the

………m onitor has been opened.

………

This covers all external and internal tubing and tubing connections.

………

(6)

………

In cases where the performance of the NiBP is in question or could have been compromised

………

during repair the complete set of NiBP performance tests described in this service manual

………

should be used (see test map, page 8, for guidance).

………

(7)

………

the monitor NiBP connector.

………

2. Wrap the cuff around itself and place on a table for the test, DO NOT place the cuff on your arm.

(8)

Kaynakça:

Philips A1 and A3 Patient Monitors- Service Guide Service Guide.

Philips Medical Systems

Referanslar

Benzer Belgeler

It ensures safe processes by means of the locking system which does not allow the

This key is used to set the speed and time during programming and to check the RCF value during the operation..

Connect the centrifuge to a correctly grounded power

• At the end of the adjusted time the motor stats to slow down and ‘br’ is seen on the speed

In case of a power cut or any defects, the instrument would be opened manually to be able to get the

Battery If the monitor has not been used for a long period of time, the battery will need.. Note Storing the monitor for a long period without charging the battery can

This section discusses the tests used to verify performance following repairs or during

diagram, power supply, isolated front end, NiBP control, the SpO2 processing module,