• Sonuç bulunamadı

irndııstria! d e v e l o p t m a nt bank of t u r k ey

N/A
N/A
Protected

Academic year: 2021

Share "irndııstria! d e v e l o p t m a nt bank of t u r k ey"

Copied!
6
0
0

Yükleniyor.... (view fulltext now)

Tam metin

(1)

Foto: Göktıığ Vensürel banka holü

irndııstria!

d e v e l o p t m a n t

b a n k o f t u r k e y

Project - Control:

Metin HEPGÜLER, Arch. Eng, M.S. Decoration:

Metin HEPGÜLER — Alev HEPGÜLER Statics Project:

Prof. Yusuf BERDAN, Const. Eng., M.S. Installations Project:

Tn the name of Selnikel A.Ş.

Fikret TAŞANGIL, Mech. Eng., M.S. Electric Installations Project:

Erol ERCAN, Electrical Eng., M.S.

The new service building of Türkiye Sınaî Kalkınma Bankası A.Ş. (Industria) Development Bank of Turkey) has been constructed on a plot of 2400 m2 on the Meclisi Mebusan Avenue between Kaba-taş and Fındıklı, İSTANBUL.

The building is composed of a double basement, a ground flodr with garage, four normal floors and a studio floor con-taining the kitchen and the cafeteria. The front of the building is exposed to excessive sunshine. In order ta eliminate this, the outside of the building has been construc-ted with horizontal projections stepped up every floor and îying in the direction of the Bosphorus to increase the horizontal effect and looking onto the main avenue and the side road.

With the horizontal cassets and mo-dules and the vertical alııminum cons-truction materials repeated on the axes. the sunshine particularly from the western direction has been prevented. The window frames are of aluminum and the windows are the transom type that can be opened for cleaning. The outside surface of the building is coıvered with dark green diabase marble and smoke-gray aluminum sheets. The ground floor is paved with salicaceae-beige marble and the other floors are co-vered with wall-to-wall carpeting. The partition panels are veneered with teak with vertical modular spacings över man-nesmann frame construction. Ali the cei-lings are false ceicei-lings of perforated alu-mir.um. Betvveen the concrete ceiling base

(2)

and the false ceiling there is a space of 20 cm. through wich the air conditicining connections of the building pass. By using glass wool in the false ceiling> carpeting on the floor and with the measures taken in the partition panel construction, the acoustics problems have beea solved.

The internal lighting of the building has been provided by using Iamps in baııds on the ceiling parallel to the front of the building.

The building is of framed reiııforced concrete and the floor concrete bases are 23 cm. without beams. A retaining wall which is 9.5 meters high has been cons-tructed on four rows of concerete columns behind the building and the top of each

layer has been decorated vvith plants. The basement which is below sea level and has the air conditioning plant is within the reinforced concrete retaining wall and has double layer insulation. The heating and the air conditioning projects have been re-alized by Selnikel A.Ş. and the firm Sul-zer has acted as a consultant.

The air conditioning system of the building is based on pressurized air and will provide cooling during the summer and heating during the winter as well as the necessary ventilation in the offices. The climatized air is blown through the perforated ceiling and recirculated in the corridor ceilings, A special air conditio-ning ıınit manııfactured by Selnikel with

90.000 m3/hour air yield and 212 mm. static pressure has been used for the offices The air conditioning system is adjusted automatically by the electro - pneumatic control system.

The main constructor for the cons-truction of the building is A E A înşaat Kollektif Şirketi. The a,ir conditioning system and the sanitary ınstallations have been installed by Selnikel Tsıtma ve Klima Cihazları Sanayii A.Ş., the woodwork has been prepared by Ağaç ve Metal İşleri Ol-gunlaşma Enstitüsü and Efes Mobilyacılık Firması. The aluminum work and elev?.-tors have been undertaken by the firm TÜRKELÎ. the electric installations by the firm ETA.

m

(3)
(4)
(5)

n

(6)

merdiven

1

1

Referanslar

Benzer Belgeler

Araç; 6 adet thruster (Sualtı Tahrik Ünitesi), su sızdırmaz tüp, iskelet destek çubukları, Penetratörler (Kablo tutucular), üst korumalık kapak, alt-üst

Uzaktan Eğitim Uygulama ve Araştırma Merkezi Microsoft Teams Uygulamasında İlk Defa OturumAçacak Öğrencileri İçin..

Destek m ktarının %25’ , varsa uygun mal yet olmayan harcamaların kes nt ler yapıldıktan sonra, f nal raporun onaylanmasını tak p eden 15 ş günü çer s nde

Okul olarak eğitim felsefemizi cumhuriyetimizin temel değerleri ve 2023 eğitim vizyonu

zmir l Müdürlü ümüzce 12 Ocak 2009 tarihinde Ortopedik Özürlüler Derne inde zmir Büyük ehir Belediyesi Yerel Gündem 21 toplulu una, Kurumuzun hizmetleri, özürlülere

MATRA programlar kapsam ndaki “ KUR’un Kurumsal Yap n Güçlendirilmesi, Özürlüler için Geli mi Bir stihdam Stratejisi ve Mesleki Rehabilitasyon Projesi” nin faaliyet

[r]

TİHV Tedavi Merkezlerine 2019 içinde yapılan 908 yeni başvuru içinde ülke içinde işkence ve diğer kötü muamele uygulamalarına maruz kalan başvuru sayısının 838,