• Sonuç bulunamadı

Waste water and Stream Rehabilitation Activities

Belgede ANNUAL REPORT ’12 (sayfa 188-191)

Table 25

Tesisin Adı

Yenikapı Waste water Preliminary Treatment Facility Üsküdar Waste water Preliminary Treatment Facility Baltalimanı Waste water Preliminary Treatment Facility Büyükçekmece Waste water Preliminary Treatment Facility Terkos Waste water Advanced Biological Treatment Facility Küçükçekmece Waste water Preliminary Treatment Facility Kadıköy Waste water Preliminary Treatment Facility Küçüksu Waste water Preliminary Treatment Facility Bahçeşehir Waste water Biological Treatment Facility Çanta Waste water Biological Treatment Facility Gümüşyaka Waste water Biological Treatment Facility Çatalca Akalan Vil. Waste water Biological Treatment Facility Çatalca Belgrat Vil. Waste water Biological Treatment Facility Çatalca Örencik Vil. Waste water Biological Treatment Facility Şile Kumbaba Waste water Preliminary Treatment Facility Ömerli Waste water Biological Treatment Facility Kömürlük Waste water Biological Treatment Facility Yeniköy Waste water Biological Treatment Facility Paşabahçe Waste water Preliminary Treatment Facility Paşaköy Waste water Advanced Biological Treatment Facility Oruçoğlu Artifical Wetland Treatment Facility

Tuzla Waste water Biological Treatment Facility

Çatalca Çanakça Vil. Waste water Biological Treatment Facility Çatalca Örcünlü Vil. Waste water Biological Treatment Facility Ataköy Waste water Advanced Biological Treatment Facility Çatalca İzzettin Vil. Biological Treatment Facility Çatalca Başakköy Biological Treatment Facility Çatalca Kestanelik Biological Treatment Facility Öğümce Vil. Waste water Biological Treatment Facility Şile Ağva Advanced Biological Treatment Facility Sahilköy Waste water Biological Treatment Facility Çatalca İhsaniye Biological Treatment Facility Çatalca Oklalı Vil. Biological Treatment Facility Çatalca Yazlık Vil. Biological Treatment Facility Şile Karakiraz Vil. Biological Treatment Facility Şile Koçullu Vil. Biological Treatment Facility Şile Kervansaray Vil. Biological Treatment Facility Şile İmrenli Vil. Biological Treatment Facility Boyalık . Biological Waste water Treatment Facility Subaşı Biological Waste water Treatment Facility Ambarlı Advanced Biological Waste water Treatment Facility*

TOTAL

Waste water Treatment Facilities

Year of Capacity Total Amount of Waste Water Total Amount of Waste Water

Rollout (m3/day) Treated in 2011 (m3/day) Treated in 2011 (m3/year)

1988 864,000 717,083 261,735,300

1992 77,760 27,895 10,181,580

1997 625,000 481,682 175,814,000

1998 155,120 74,051 27,028,516

2000 1,730 1,465 534,786

2003 354,000 152,511 55,666,472

2003 833,000 451,343 164,740,166

2004 640,000 220,320 80,416,930

2004 7,400 7,833 2,858,900

2000 (1st stage) 100,000 123,405 45,042,850

2009 (2nd stage) 100,000

2009 125 181 65,997

1998 (1st stage) 150,000 308,608 112,641,853

2009 (2nd stage) 100,000

2010 500 389 141,907

2010 250 144 52,696

2010 400,000 320,808 117,094,884

2010 500 652 138,094

5,440,960 2,939,721 1,072,892,863

Total Amount of Waste Water Total Amount of Waste Water

Table 26 Existing Channel Grid Data

Type of Piping Amount 2011 2012

Eco-friendly Channel Grid m 12.841.982 13.188.743

Eco-destructive Channel Grid m 937.459 874.942

TOTAL m 13.779.441 14.063.685

Resource. İSKİ, 2012

Ambarlı Advanced Biological Treatment Facility, 2012

Istanbul Metropolitan Municipality

179 ANNUAL REPORT

12

Table 27

Title of Work

European Side 4th Stage Misc. Waste water Collectors and Grid Construction

European Side 2007 5th Stage Waste water Channel and Rainwater Channel and Stream Rehabilitation Construction European Side 12th Stage Waste water Channel and Rainwater Channel and Stream Rehabilitation Construction European Side 2007 3rd Stage Waste water Channel and Rainwater Channel and Stream Rehabilitation Construction European Side 1st Stage Wastewater Tunnel Construction

Firüzköy Wastewater Tunnel Construction

European Side 4th Stage Wastewater Tunnel Construction European Side 3rd Stage Wastewater Tunnel Construction

Table 28

Title of Work

Asian Side 4th Stage Misc. Wastewater Channel, Rainwater Channel and Stream Rehabilitation Construction

Riva Basin 1st Stage Wastewater Channel, Rainwater Channel, Stream Rehabilitation and Treatment Facility Construction

Asian Side 6th Stage Misc. Pipe Jacking Construction Asian Side 5th Stage Misc. Pipe Jacking Construction Asian Side 8th Stage Misc. Wastewater ve Rainwater Channel Construction

Asian Side 7th Stage Misc. Wastewater ve Rainwater Channel Construction

Asia 1st Region 2011 1st Stage Misc. Wastewater Channel and Rainwater Channel Construction

Asian Side 2th Stage Wastewater Channel, Rainwater Channel and Stream Rehab. Construction

Asia 2nd Region 2011 2nd Stage Misc. Wastewater Channel, Treatment Facility and Rainwater Channel Construction Asia 2nd Region 2011 1st Stage Misc. Wastewater Channel and Rainwater Channel Construction

Asia 2nd Region 2012 1st Stage Misc. Wastewater Channel, Rainwater Channel and Stream Rehab Construction Beylerbeyi-Küçüksu Wastewater Tunnel Supply Construction

European Side 2nd Stage Wastewater Tunnel Construction European Side 2007 5th Stage Wastewater Channel, Rainwater Channel and Stream Rehab. Construction

Europe 1st Region 2012 1st Stage Tunnel Construction Europe 1st Region 2011 1st Stage Misc. Wastewater and Rainwater Channel Construction

Completed Wastewater Investments Remarks

27.379 m wastewater and rain water channel, 2.610 m stream rehabilitation and 1.596 m pipe jacking construction was done, activities were completed.

In scope of the work 8.352 m concrete, reinforced concrete and CTP piping was installed, works are ongoing at Ayamama Stream, E5 Çobançeşme Junction and Fidanlık estate.

Ø300 - Ø1400 mm wastewater construction 110.000 m, 30.629 m Ø400 - Ø2200 mm rainwater construction were completed.

In scope of the work 81.438 m wastewater channel, 10.705 m rainwater channel and 3.948 m unprocessed water channel were constructed, and the work was completed.

In scope of the work; Ø2000 mm 11.723 m tunnel construction, Ø1800-1200mm. 680 m branch duct and 19 tunnel shaft constructions were completed. The work was completed on 19.09.2012 and temporary approval was conducted..

In scope of the work; Ø3600 mm 772 m wastewater collector, 4.670 m wastewater tunnel with an inner diameter of Ø2600 mm 264 m branch duct with a diameter of, Ø1200/1800, 5 duct shafts and 85 m Ø3600 mm conventional tunnel were constructed. Temporary approval was conducted.

In scope of the work; Ø2800 mm 6.296 m and Ø2200 mm 2.379 m wastewater tunnel, and Ø1200-1800 mm 649 m branch duct constructions were completed. The work was completed on 31.07.2012.

In scope of the work Ø2200mm. 4.250 m wastewater tunnel, Ø2200mm 700 m pipe jacking, 3 shafts with Ø9m outer diameter, inlet structure elevation center and security booth were planned. The work was completed and the facility was commissioned with temporary approval.

Resource. İSKİ, 2012

Ongoing Waste water and Stream Rehabilitation Investments-1 Remarks

In scope of the work 26.229 m wastewater and rainwater channel construction and 777 m HDPE wastewater with Ø300-Ø600mm diameters, and 70 m HDPE rainwater with Ø1400mm diameter and 275 m stream rehabilitation was done; activities are in progress.

In scope of the work, total 51.670 m wastewater channel of various diameters and 136 m rainwater channel btw. diameters of Ø400-Ø2400 were constructed. Work is ongoing.

In scope of the work, a total of 20.049 m piping of various diameters was installed and 1.290 m pipe jacking channel construction was done; activities are in progress.

In scope of the work, of 3.263 m wastewater and rainwater channel with various diameters were installed and 182 m pipe jacking channel construction was built; activities are in progress.

In scope of the work, 9.874 m piping with various diameters was installed and 760 m pipe jacking was completed. Activities are in progress.

In scope of the work, a total of 31.060 m wastewater channel with diameters ranging btw Ø300-Ø2200 mm and 5.113 m rainwater channel diameters ranging btw Ø400-Ø2200 mm were completed, the activities are still in progress.

In scope of the work, 7.434 m wastewater channel with diameters ranging btw Ø300-Ø2400 mm, 2.007 m rainwater channelwith diameters ranging btw Ø400-Ø2400 mm and 25 m stream rehabilitation constructions were completed, the activities are still in progress.

In scope of the work, the constructions of a total of 19.394 m wastewater channel with diameters ranging btw. Ø300-Ø1600 mm and 6.401 m rainwater channel diameters ranging btw Ø400-Ø1800 mm were completed; the activities are still in progress.

In scope of the work, 8.679 m wastewater channel with diameters ranging btw. Ø300-Ø1400 mm and 93 m rainwater channel diameters ranging btw. Ø400-Ø1600 mm were constructed; the activities are ongoing.

In scope of the work, 10.238 m wastewater channel construction with Ø300-Ø600 mm, diameter was made, the activities are still in progress.

In scope of the work, 1the construction of 40 m wastewater channel with a diameter of Ø1600 mm was completed, the activities are still in progress.

In scope of the work, 4.341 m wastewater tunnel with a diameter of Ø2200 mm and second lining of the tunnel, 501 m branch duct btw. the diameters of 1200/1800 mm ovoid section and branch duct second lining, 9 duct shafts and 2 branch shafts were planned. The location was delivered and the activities were recently initiated.

In scope of the work, excavation for S7, S6, S5, S4, S3, S2, S1 and B1 shafts were completed. Second concrete lining for S7,S6,S4,S3,S2 and S1 shafts were completed. 8.458 m tunnel construction with an inner diameter of 3600 mm. and 4.488 m tunnel second lining were completed.

In scope of the work, approximately 800 m stream rehabilitation, 8.300 m of wastewater, rainwater grid and collector, 439 m pipe jacking and 2 bridge constructions on Ayamama Stream route which includes Bakırköy Districts and Bahçelievler Districts were completed.

The work includes 4.073 m wastewater tunnel, 2 duct shafts, 3.211 m wastewater channel, 165 m pipe jacking constructions. The work was initiated and 26 m of pipe jacking with an inner diameter of Ø2000 mm was completed.

In scope of the work, 12.295 m wastewater construction, 5.100 m rainwater construction was completed.

Resource. İSKİ, 2012

ISTANBUL METROPOLITAN MUNICIPALITY I 2012 ANNUAL REPORT

Environmental Management 180

Table 29

Title of Work

European Side 2007 4th Stage Misc. Wastewater and Rainwater Channel Construction

Europe 1st Region Villages Misc. Grid Construction Europe 1st Region 2011 3rd Stage Misc. Wastewater and Rainwater Kanal Construction

Europe 1st Region 2011 2nd Stage Misc. Wastewater and Rainwater Channel Construction

Ayamama Stream 2011 Wastewater Channel, Rainwater Channel and Stream Rehabilitation Construction

Büyükçekmece Basin Misc. Wastewater Channel, Rainwater Channel and Stream Rehabilitation Construction

European Side 2010 1st Stage Wastewater and Rainwater Channel Construction

European Side 2010 2nd Stage Wastewater and Rainwater Channel Construction

Ambarlı Basin Misc. Collector and Grid Construction

Çanta (Silivri) Wastewater Tunnel, Collectors and Grid Construction

Çanta Basin Misc. Wastewater Collectors Grid Connectionsı Construction

Gürpınar and Çanta Wastewater Tunnel Construction Büyükçekmece Wastewater Tunnel Construction

European Side 2010 3rd Stage Wastewater and Rainwater Channel Construction

Başakşehir Districts Misc. Wastewater and Rainwater Channel Construction

Büyükçekmece Wastewater Treatment Facility Connections Tunnel and Collector Construction

Europe 2nd Region 2012 2nd Stage Misc. Wastewater, Rainwater Channel and Stream Rehabilitation Cons.

European Side 2010 4th Stage Wastewater and Rainwater Channel Construction

Asian Side 1st Stage Misc. Wastewater Treatment Facility

Ambarlı Wastewater Treatment Facility Construction Avrupa Misc. Wastewater Treatment Facility Construction

Büyükçekmece Wastewater Treatment Facility Construction

Ongoing Waste water and Stream Rehabilitation Investments-2 Remarks Until today, 82.349 m construction of various diameters was done; the activities are ongoing.

Until today, 24.865 m wastewater channel and 1.438 m rainwater channel constructions were done; the activities are ongoing.

In scope of the work, 10.478 m wastewater and rainwater channel constructions were done; the activities are ongoing.

In scope of the work, 28.600 m wastewater channel and 5.870 m rainwater channel were completed in Arnavutköy Districts; the activities are ongoing.

In scope of the work; Bağcılar, 3,600 m stream rehabilitation, 73,614 m wastewater and rainwater grid and collector, 1i432 m pipe jacking, 1000 m pipe towing, 1000 m microtunnel boring, 2 pump station constructions were planned for the Ayamama Stream Route which includes Bahçelievler and Küçükçekmece Districts.

In scope of the work; Ø300-Ø2200 mm 85.430 m wastewater and rainwater channel, 652 m wastewater channel with pipe towing method and 1.632 m stream rehabilitation constructions were completed and the activities are ongoing along with the construction of 1 grit arrester.

In scope of the work; the constructions of totally 38.972 m wastewater grid and collector with diameters of Ø300-1200 mm were done; the activities are ongoing.

In scope of the work; Ø300-800 mm 63.579 m wastewater channel construction in Beyciler and Büyükçavuşlu villages were done; the activities are ongoing.

In scope of the work; Ø3600 mm 274 m wastewater tunnel, Ø300-Ø2000 mm 6.031 m wastewater grid and collector constructions were completed; the activities are ongoing.

In scope of the work; Ø300-Ø800 mm 5.477 m wastewater grid and collector constructions were completed in Büyükçekmece Districts; the activities are ongoing.

In scope of the work; a total of 18.149 m wastewater grid and collector with inner diameters of Ø300mm-Ø1400 mm and 70 m pipe jacking constructions were completed; the activities are ongoing.

In scope of the work; 93 m wastewater tunnel with Ø2000 mm inner diameter and the excavation for 2 shafts were completed; the activities are ongoing.

In scope of the work; 48 m Ø2000 mm wastewater tunnel and the excavation for 2 shafts were completed; the activities are ongoing.

In scope of the work; the construction of totally 24.463 m wastewater channel with diameters of Ø300mm-Ø1200mm was completed; the activities are ongoing.

In scope of the work; the constructions of 18.183 m Ø300mm-Ø2000 mm wastewater channel, 4.347 m Ø400mm-Ø2000mm rainwater channel were completed; the activities are ongoing.

In scope of the work; 360 m wastewater tunnel with an inner diameter of Ø2800mm and the excavation for 2 shafts were completed; the activities are ongoing.

In scope of the work; 100 m stream rehabilitation and 72 m Ø300- Ø1400 mm wastewater channel were completed; the activities are ongoing.

In scope of the work; a total of 35.253 m wastewater channel construction with diameters of Ø300mm-Ø1400mm was completed; the activities are ongoing.

A total of 28 village treatment facilities with the capacities of 125 m3/day, 250 m3/day and 500 m3/day will be installed to the villages in Şile, Beykoz and Pendik districts. . The wastewater in Avcılar, Büyükçekmece, Esenyurt, Gürpınar, Kıraç, Yakuplu, Kavaklı regions will be collected by means of collectors to be transferred to Ambarlı advanced biological wastewater treatment facility. The facility to be constructed will suffice to render service with 400.000 m3/day average flowrate at the 1st stage and 1.000.000 m3/day average flowrate at the second stage to serve a population of 4.000.000..

The remaining constructions for 6 village wastewater treatment facilities with capacities of in 1.000 ane 2.000 m3/day Arnavutköy, Çatalca and Silivri districts are to be completed.

It is planned to bring the incoming wastewater from Mimarsinan and Gürpınar collectors and Çakmaklı collector into a dischargeable status to the receiving media (Marmara Sea) subsequent to treatment in Büyükçekmece Advanced Biological Wastewater Treatment Facility. The facility to be constructed will treat wastewater with an average flow rate of 132.155 m3/day at the initial stage. Thanks to the facility, the wastewater will be treated in an advanced biological way with decarbonisation, denitrification and dephosphorization.

Resource. İSKİ, 2012

Ambarlı Basin Collector and Büyükçekmece Wastewater

Grid Construction, 2012 Tunnel, 2012

Istanbul Metropolitan Municipality

181 ANNUAL REPORT

12

Ayamama Stream Rehabilitation Çanta Basin Wastewater Collectors

Activities, 2012 Grid and Connections Construction, 2012

Sea Water Transportation Tunnel from Bosphorus