• Sonuç bulunamadı

BATI ANADOLU YÜK TEVZĐ SUNUMU

N/A
N/A
Protected

Academic year: 2022

Share "BATI ANADOLU YÜK TEVZĐ SUNUMU"

Copied!
49
0
0

Yükleniyor.... (view fulltext now)

Tam metin

(1)

TEĐAŞ

BATI ANADOLU

YÜK TEVZĐ

(2)

SĐSTEMĐN YAPISI

(3)

BATI ANADOLU YÜK TEVZĐ BÖLGESĐ

• ĐZMĐR, MANĐSA, AYDIN, MUĞLA

• DENĐZLĐ,AFYON,UŞAK

• BALIKESĐR,ÇANAKKALE

(4)

• 16 ADET 380 kV MERKEZ ( 6 SI SANTRAL)

• 134 ADET 154 kV MERKEZ

( 22 SĐ SANTRAL)

(5)

BATI ANADOLU BÖLGESĐ SANTRALLARI

1010 168

10 FUEL OĐL

19775 3047

8 LĐNYĐT

3345 1123

27 SU

140 23

2 JEOTERMAL

394 130

7 RÜZGAR

YILLIK ÜRETĐM KAPASĐTESĐ

GWh KURULU GÜC

MW SANTRAL SAYISI

ENERJĐ KAYNAĞI

(6)

ĐLETĐM HATLARI

• 380 kV HAT UZUNLUĞU

• 2600 km

• 154 kV HAT UZUNLUĞU

• 8500 km

(7)

TRAFOLAR

380/154 kV 7020 MVA

380/34,5 kV 375 MVA

380/10,5 kV 375 MVA

(8)

REAKTÖR VE KAPASĐTÖRLER

320 MVAr REAKTÖR (380 VE 15,8 kV)

450 MVAr KAPASĐTÖR (34,5 kV BARALARA BAĞLI)

5 MERKEZĐMĐZE 154 kV BARALARA HERBĐRĐ 60 MVAr KAPASĐTÖR

KONACAKTIR

(9)
(10)

TÜRKĐYE TOPLAM ÜRETĐMĐ

109.320 GWh 2007 7 AYLIK ÜRETĐM

%8,9 2005/2006 ÜRETĐM

ARTIŞI

175.568 GWh 2006 YILI TÜRKĐYE

ÜRETĐMĐ

161.192 GWh 2005 YILI TÜRKĐYE

ÜRETĐMĐ

(11)

BATI ANADOLU BÖLGESĐ ÜRETĐMĐ

30.916 GWh 2006 YILI ÜRETĐMĐ

29.405 GWh

2005 YILI ÜRETĐMĐ

(12)

TÜKETĐM VERĐLERĐ

(13)

TÜRKĐYE TÜKETĐMĐ

%8,6 2005/2006 TÜKETĐM

173.915 GWh 2006 YILI TÜRKĐYE

TÜKETĐMĐ

160.099 GWh 2005 YILI TÜRKĐYE

TÜKETĐMĐ

(14)

TÜRKĐYE PUANTI

28.794 MW 2007 7 AYLIK PUANT

%9,6 2005/2006 PUANT

ARTIŞI

27.594 MW 2006 YILI TÜRKĐYE

PUANTI

25.174 MW 2005 YILI TÜRKĐYE

PUANTI

(15)

BATI ANADOLU TÜKETĐMĐ

%10,8 2005/2006 TÜKETĐM

36.522 GWh 2006 YILI TÜKETĐMĐ

32.962 GWh

2005 YILI TÜKETĐMĐ

(16)

BATI ANADOLU PUANTI

6.601 MW 2007 7 AYLIK PUANT

%12,1 2005/2006 PUANT

ARTIŞI

6.197 MW 2006 YILI PUANTI

5.528 MW

2005 YILI PUANTI

(17)

ĐZMĐR ĐLĐ TÜKETĐMĐ

%4,4 2005/2006 TÜKETĐM

12.979 GWh 2006 YILI TÜKETĐMĐ

12.427 GWh

2005 YILI TÜKETĐMĐ

(18)

ĐZMĐR ĐLĐ PUANTI

2.358 MW 2007 7 AYLIK PUANT

%13,6 2005/2006 PUANT

ARTIŞI

2.268 MW 2006 YILI PUANTI

1.996 MW

2005 YILI PUANTI

(19)

YILLAR ĐTĐBARĐYLE ĐL TÜKETĐMLERĐ

747.386 660.736

609.713 491.780

453.973 476.444

481.917 UŞAK

908.237 816.283

762.753 677.894

663.415 648.366

674.646 AFYON

894.810 1.289.066

1.250.134 1.174.033

939.079 926.453

957.519 ÇANAKKALE

1.911.972 1.795.651

1.622.060 1.592.700

1.566.688 1.622.201

1.699.471 BALIKESĐR

2.475.213 2.125.371

2.066.790 1.775.948

1.661.045 1.563.047

1.620.609 MANĐSA

2.061.727 1.900.389

1.798.584 1.735.555

1.623.845 1.515.708

1.488.514 MUĞLA

2.470.701 2.275.022

2.140.753 1.740.368

1.653.441 1.666.520

1.671.077 DENĐZLĐ

1.482.079 1.335.128

1.259.339 1.203.102

1.145.926 1.151.056

1.155.105 AYDIN

12.978.976 12.427.452

12.092.207 10.657.068

10.803.317 10.053.614

10.054.824 ĐZMĐR ĐL

11.920.749 6.279.641

5.809.010 5.062.317

5.043.275 4.800.044

4.903.050 ĐZMĐR METROPOL

2006 2005

2004 2003

2002 2001

2000 TÜKETĐM (MWh)

(20)

YILLAR ĐTĐBARĐYLE ĐL PUANTLARI

209,0 206,0

192,0 190,0

169,0 175,0

183,0 KONYA

62,0 46,0

32,0 41,0

41,0 47,0

47,0 BURDUR

130,0 101,0

96,0 104,1

110,6 110,6

110,0 ISPARTA

908,0 785,0

663,0 553,0

548,0 509,0

447,0 ANTALYA

101,0 94,0

85,0 79,0

65,0 74,0

67,0 UŞAK

166,0 151,0

142,0 124,0

115,0 122,0

115,0 AFYON

134,0 119,0

163,0 152,0

131,0 124,0

128,0 ÇANAKKALE

328,6 290,0

258,0 238,0

255,0 260,0

235,0 BALIKESĐR

404,0 365,0

333,0 288,0

264,0 254,0

279,0 MANĐSA

413,0 354,0

310,0 313,0

309,0 309,0

274,0 MUĞLA

372,5 342,0

325,0 285,0

255,5 217,0

209,0 DENĐZLĐ

246,0 224,0

188,0 183,0

180,0 194,0

186,0 AYDIN

2072,0 1865,0

1759,0 1705,0

1629,0 1.609,0

1.533,0 ĐZMĐR ĐL

1581,0 980,0

912,0 830,0

793,0 921,0

797,0 ĐZMĐR METROPOL

2006 2005

2004 2003

2002 2001

2000 PUANT (MW)

(21)

2007 ĐL TÜKETĐMLERĐ

71.232 68.708

70.109 67.522

69.110 60.934

62.004 UŞAK

114.968 98.042

94.103 76.382

76.862 66.828

72.534 AFYON

282.186 220.816

174.885 151.909

153.058 152.111

174.282 MUĞLA

247.754 227.018

223.328 209.877

208.463 199.546

275.944 DENĐZLĐ

172.221 142.625

123.625 116.479

128.279 124.854

135.541 AYDIN

84.446 73.153

68.940 65.503

74.604 63.465

69.063 ÇANAKKALE

218.562 189.287

165.478 171.195

184.681 166.803

195.576 BALIKESĐR

286.582 255.665

216.316 199.919

212.952 189.090

200.607 MANĐSA

1.455.439 1.315.424

1.201.335 1.203.872

1.351.339 1.180.676

1.190.117 ĐZMĐR ĐL

TEMMUZ HAZIRAN

MAYĐS NISAN

MART ŞUBAT

OCAK ĐLLER

(22)

2007 ĐL PUANTLARI

207,0 199,0

205,0 175,0

174,0 173,0

171,0 KONYA

67,0 66,0

72,0 53,0

42,0 45,0

46,0 BURDUR

130,0 127,0

127,0 113,0

115,0 107,0

112,0 ISPARTA

959,0 980,0

623,0 588,0

616,0 746,0

686,0 ANTALYA

116,0 114,0

113,0 98,0

91,0 98,0

67,0 UŞAK

194,0 201,0

163,0 113,0

117,0 120,0

117,0 AFYON

384,0 330,0

258,0 246,0

296,0 314,0

304,0 MUĞLA

391,0 384,0

350,0 328,0

323,0 344,0

355,0 DENĐZLĐ

239,0 216,0

201,0 187,0

234,0 247,0

257,0 AYDIN

136,0 112,0

108,0 110,0

128,0 124,0

118,0 Ç. KALE

332,0 310,0

267,2 272,4

294,2 303,0

291,0 BALIKESĐR

415,0 362,0

330,0 316,0

267,0 277,0

274,0 MANĐSA

2.358,0 2.316,0

1.915,0 2.088,0

2.173,0 2.266,0

2.088,0 ĐZMĐR ĐL

TEMMUZ HAZĐRAN

MAYIS NĐSAN

MART ŞUBAT

OCAK

(23)

BÜYÜK ÜRETĐM TESĐSĐ

(24)

380 kV 2x3B 954 mcm Varsak-Denizli hattına branşman ( 2 km )

6280 785,2

ANTALYA ENERJĐ SANTRALI AKSA ENERJĐ

ÜRETĐM A.Ş.

380 kV 2x3B 954 mcm Antalya DG Sant-Varsak TM ( 8 km )

3600 450

ANTALYA DOĞAL

GAZ SANTRALI YALINKAYA

ELEKTRĐK ÜRETĐM A.Ş.

380 kV 2x3B 954 mcm ei hatlarından biri Aliağa barasına,diğeri Soma barasına

6000 797,4

EGE ELEKTRĐK ÜRETĐM A.Ş.

380 kV 2x3B 954 mcm Aliağa TES-HabaşTES eih ( 2 km )

3900 600

HABAŞ TERMĐK SANTRALI HABAŞSINAĐVE

TIBBĐGAZLAR ĐSTĐHSAL ENDRÜSTRĐSĐA.Ş.

380 kV 2x3B 954 mcm Aliağa TES-Đzmir DGKÇ Santralı eih ( 4 km ) 380 kV 2x3B 1272 mcm Aliağa TES-BrnşAliağa- Manisa eih ( 7 km ) 4875

750 ALĐAĞA

ENERJĐ SANTRALI ENKA ENERJĐ

ÜRETĐM A.Ş.

BAĞLANTI ŞEKLĐ YILLIK

ÜRETĐM KAPASĐTESĐ

( GWh ) KURULU

GÜC ( MW )

SANTRAL ŞĐRKET ADI ADI

YAPIM AŞAMASINDAKĐ TERMĐK ÜRETĐM TESĐSLERĐ

(25)

Tarımsal Sulama ve

Buldanda Adıgüzel HES mansabında.Baraj 2007 yılı

sonunda bitecek.Santral Haziran 2009 da bitecek.

31.12.2007 3*9,25+1,56=29 88

84.27 Tarımsal

Sulama ve Enerji Üretimi CĐNDERE

BARAJ VE HES

Köyceğizde Dalaman çayı üzerinde.Santral Siemens

tarafından yapılıyor.

31.12.2008 343

2*57,5=115 384,50

Tarımsal Sulama ve

Enerji Üretimi AKKÖPRÜ

BARAJ VE HES

Buldan'da Çine çayı üzerinde yapılıyor.Gövde imalatı ve

santralın çıkışsuyu tesisleri yapımı sürüyor.Santral yapımına

başlanmadı(Temsan yapacak.)

31.12.2009 118

2*26,6=53,2 350,00

Tarımsal Sulama ve

Enerji Üretimi ÇĐNE

BARAJ VE HES

AÇIKLAMA BĐTĐŞ

TARĐHĐ YILLIK

ÜRT.

KAP.

(GWh) KURULU GÜC

( MW ) BARAJ

DEPO HACMĐ

M3 TESĐS

AMACI TESĐS ADI

YAPIM AŞAMASINDAKĐHĐDROLĐK ÜRETĐM TESĐSLERĐ

(26)

ÖNEMLĐ ĐLETĐM

YATIRIMLARI

(27)

154 kV, 2*1272+1272

2008 154/33 kV, 2*25 MVA

ALSANCAK GIS TM

380/33 kV, 125 MVA ve 33 2008 kV, kapalı şalt

UZUNDERE 380 TM

BĐTĐŞ TARĐHĐ ÖZELLĐKLERĐ

TESĐS ADI

ĐZMĐR 2007 YATIRIM PROGRAMI

(28)

2009 154/33 kV, 100 MVA ve 2. trafo fideri

AKSAZ TM

2009 154 kV, 2*2B, 954 mcm, 44 km

Muğla-Marmaris eih

2008 154 kV, 1272 mcm, 24 km

Akköprü HES-Fethiye TM eih

BĐTĐŞTARĐHĐ ÖZELLĐKLERĐ

TESĐS ADI

MUĞLA 2007 YATIRIM PROGRAMI

2009 154/33 kV, 100 MVA ve 2. trafo fideri

SOMA B TM

2008 154 kV, 1272 mcm, 1 km

Soma A-Soma B eih yenileme

BĐTĐŞTARĐHĐ ÖZELLĐKLERĐ

TESĐS ADI

MANĐSA 2007 YATIRIM PROGRAMI

2008 154 ve 33 kV şaltın yenilenmesi

AYDIN TM

2008 154 ve 33 kV şaltın yenilenmesi

NAZĐLLĐ TM

BĐTĐŞTARĐHĐ ÖZELLĐKLERĐ

TESĐS ADI

AYDIN 2007 YATIRIM PROGRAMI

(29)

BĐTĐŞTARĐHĐ ÖZELLĐKLERĐ

TESĐS ADI

ISPARTA 2007 YATIRIM PROGRAMI

2009 154 kV, 1272 mcm, 36 km

Gönen-Bandırma 3 eih

BĐTĐŞTARĐHĐ ÖZELLĐKLERĐ

TESĐS ADI

BALIKESĐR 2007 YATIRIM PROGRAMI

2009 154 kV, 1272 mcm, 55 km

Afyon 2-Altıntaşeih

2010 380 kV, 3B, 954 mcm, 200 km

Temelli-Afyon 2 eih

BĐTĐŞTARĐHĐ ÖZELLĐKLERĐ

TESĐS ADI

AFYON 2007 YATIRIM PROGRAMI

2007 154/33 kV, 100 MVA ve 2. trafo fideri

TAVAS TM

2010 380 kV, 3B, 954 mcm, 175 km

Afyon 2-Denizli eih

BĐTĐŞTARĐHĐ ÖZELLĐKLERĐ

TESĐS ADI

DENĐZLĐ 2007 YATIRIM PROGRAMI

(30)

2009 154/33 kV, 100 MVA ve 2. trafo fideri

GÜNDOĞDU TM

2009 154 kV, 795 mcm, 29 km

Gazipaşa-Alanya 2 eih

2009 154 kV, 2*1272 mcm, 60 km

Kemer-Finike eih

2009 154/33 kV, 100 MVA ve 2. trafo fideri

MANCARLIK GIS TM

2009 154 kV, 1272 mcm, 46 km

Oymapınar-Serik eih

2009 154 kV, 1272 mcm, 66 km

Oymapınar-Alanya 2 eih

2008 154/33 kV, 100 MVA ve 2. trafo fideri

ALANYA 2 TM

2008 154/33 kV, 100 MVA ve 2. trafo fideri

LARA 2 TM

2008 154 kV, 2*1272 mcm, 43 km

Serbest Bölge-Kemer eih

2008 154 kV, 2*1272 mcm, 29.2 km

Lara-Serik eih

2009 380 kV, 3B, 954 mcm, 120 km

Seydişehir-Varsak eih

2008 380 kV, 3B, 954 mcm, 144 km

Oymapınar HES-Ermenek HES eih

BĐTĐŞ TARĐHĐ ÖZELLĐKLERĐ

TESĐS ADI

ANTALYA 2007 YATIRIM PROGRAMI

(31)

2007 YILI YAZ PUANTI

(32)

2007 TÜKETĐM ARTIŞI

• BATI ANADOLU BÖLGESĐNDE

Haziran 2007 tüketimi, Haziran 2006 ‘ya oranla %13 fazladır.

Temmuz 2007 tüketimi, Temmuz 2006

‘dan %16 fazladır.

Türkiye geneli için bu rakamlar %11

dolaylarındadır.

(33)

YÜKSEK TÜKETĐM ARTIŞININ NEDENLERĐ

• Batı Anadolu Bölgesi puantı yaz aylarında gerçekleşir. Turizm hareketlerinin getirdiği yük artışı, elektrik enerjisi kullanılarak

yapılan tarımsal sulama, bölgede iklim şartları gereği eklenen klima ve

vantilasyon yükü, bu yıl Haziran ve

Temmuz aylarının son haftalarında

(34)

HAZĐRAN VE TEMMUZ KESĐNTĐLERĐ

• 25,26,27,28 HAZĐRAN

23,24,25,26,27,28,30,31 TEMMUZ günleri hava sıcaklıkları mevsim normallerinin oldukça üstünde

gerçekleşmiş , aşırı yük artışı gerilim

düşümlerine ve elektrik kesintilerine

neden olmuştur.

(35)

NĐÇĐN KESĐNTĐ

• Aşırı tüketim nedeniyle gerilim düşümü sonucu 380/154 kV trafo akımları

yükselmekte, aşırı yük açma

değerlerine yaklaşmaktadır. Sistemin

tümüyle oturmasını önlemek için en az

(36)

15,6 13,9

22,5

% ARTIŞ

6.498 3.554.236

3.085.925 2.007

13,3 12,6

9,8

% ARTIŞ

5.623 3.119.515

2.518.744 2.006

4.965 2.768.706

2.295.239 2.005

PUANT MW TÜKETĐM

MWh ÜRETĐM

YIL MWh

BATI ANADOLU BÖLGESĐ HAZĐRAN AYLARI MUKAYESESĐ

(37)

7,5 9,2

14,9

% ARTIŞ

5.844 3.505.761

2.865.110 2006

5.438 3.210.852

2.492.197 2005

PUANT

MW TÜKETĐM

MWh ÜRETĐM

MWh YIL

BATI ANADOLU BÖLGESĐ TEMMUZ AYLARI MUKAYESESĐ

(38)

12,9 11,4

17,1

% ARTIŞ

6.601 22.902.510

20.195.244 2.007

7,5 10,5

2,4

% ARTIŞ

5.844 20.554.942

17.235.587 2.006

5.438 18.597.851

16.832.602 2.005

PUANT

MWh TÜKETĐM

MWh ÜRETĐM

MWh YIL

BATI ANADOLU BÖLGESĐ OCAK-TEMMUZ TOPLAMLARI

7 AYLIK MUKAYESE

(39)

2.206 1.200.414

1.370.475 2.007

1.838 967.323

1.201.523 2.006

PUANT

MW TÜKETĐM

MWh ÜRETĐM

MWh YIL

ĐZMĐR METROPOLÜ HAZĐRAN AYLARI MUKAYESESĐ

(40)

21,0 29,5

18,6

% ARTIŞ

2.137 1.324.670

1.424.269 2.007

1.765 1.023.109

1.200.346 2.006

PUANT

MW TÜKETĐM

MWh ÜRETĐM

MWh YIL

ĐZMĐR METROPOLÜ TEMMUZ AYLARI MUKAYESESĐ

(41)

2.290 8.196.262

9.632.073 2.007

1.865 6.818.224

8.119.677 2.006

PUANT

MW TÜKETĐM

MWh ÜRETĐM

MWh YIL

ĐZMĐR METROPOLÜ OCAK-TEMMUZ TOPLAMLARI 7

AYLIK MUKAYESE

(42)

2008 PUANTI

ÖNLEMLERĐ

(43)

2008 DE HAZIR OLACAK ÜRETĐM TESĐSLERĐ

2007 Puantını yaşadıktan sonra Petkim 53 MW GT deneme çalışmalarına

Ağustos ayı içinde başlamıştır.

(44)

ĐLETĐM TESĐSLERĐ

2x1272 mcm Seydişehir-Akseki-Manavgat hatları

2x1272 mcm Afyon2-Çayseka hattı 154 kV Karabiga-Çan hattı

154 kV Karabiga-Biga hattı

DEVREYE ALINMIŞ OLACAKTIR

(45)

TRAFOLAR

UZUNDERE 380/34,5 kV 125 MVA

VARSAK 380/34,5 kV 125 MVA

VARSAK 380/34,5 kV 150 MVA

AFYON 380/154 kV 300 MVA

KARABĐGA 380/154 kV 150 MVA

(46)

KAPASĐTÖRLER

154 kV Baralara 60 MVAr Kapasitör bağlanacak merkezler

UZUNDERE

GERMENCĐK DENĐZLĐ

VARSAK

SERĐK

(47)

BATI ANADOLU

BÖLGESĐ ARZ

(48)

ARZ GÜVENLĐĞĐ: Batı Anadolu Bölgesi

enterkonnekte sisteme 3 adet 380 kV hat ile bağlıdır. Önümüzdeki 2 yıl içinde 380 kV

bağlantı sayısı 6 ‘ya çıkacaktır.

Bugün için EPDK ‘ya Lisans başvurusunda bulunmuş olup TEĐAŞ ‘ın bağlantı oluru

verdiği 1350 MW Đthal kömür (2100 MW olacak), 2035 MW doğal gaz (2835 MW

olacak) santralı vardır. Toplam 4835 MW olan bu santrallar 3 yıl içinde tamamlanınca kurulu gücümüz 12156 MW, Üretim kapasitemiz 59 Milyar kwh olacaktır.Bir sonraki tabloda

görüldüğü gibi arz güvenliği sorunumuz

yoktur.

(49)

BATI ANADOLU BÖLGESĐ

Artış %10 alındı

8.060 47.940.000

2009 Tahmin

Artış %11 alındı

7.327 43.580.000

2008 Tahmin

6.601 Gerçek

39.260.580 Tahmin

2007

6.197 36.522.135

2006

5.528 32.962.409

2005

PUANT TÜKETĐM

YIL

Referanslar

Benzer Belgeler

Misafir olunan yükseköğretim kurumu Erasmus kapsamında anlaşmaya varılan dönem için gelen öğrenciden herhangi bir akademik ücret talep edemez. Akademik ücret; öğrenim

Düzlemsel, silindirik veya küresel simetriye sahip sistemlerde, aynı simetriye sahip Gauss yüzeyleri seçilerek elektrik alan bulunabilir... Elektrik Alanın

* Bu uygulamada daha büyük kuvvet gerekir ama kuvvetin uygulandığı noktada, kaldıracın küçük bir hareketi bile direnci büyük bir hareket aralığında hareket ettirir..

Bu tez çalışmasında orta gerilim dağıtım bölgesinde kısa süreli gerilim düşümü ve gerilim yükselmesine karşı Şekil 5.14.’de verilen IGBT

Şekil 3.5.. Burada elde edilen kritik değerler ve marjin, n-baralı sistemi temsil eden ve k. baradan elde edilmiş bir Thevenin Eşdeğerine dayanmaktadır. n-baralı sistemde

• Tabak, çamadır, mektup, kömür vesaire çıkarmak için dolaplar. • istasyonlar ve posta merkezleri için oto-kaldıranlar

Bu neti- ceye göre, Antalyada yapılacak olan enstitünün müsabakasında mimar Asım Mutlunun avan projesi, Malatya ve Samsunda yapılacak olan müsabakanın birinciliklerini de

Yük birleşimleri programda tanımlamak için Define menüsüne girilip Load Combinations komutu ile açılacak olan pencerede, yeni Yük birleşimi eklemek için Add New Combo , var olan