• Sonuç bulunamadı

My special thanks goes to NEU educational staff, especially to computer engineering teaching

N/A
N/A
Protected

Academic year: 2021

Share "My special thanks goes to NEU educational staff, especially to computer engineering teaching "

Copied!
1
0
0

Yükleniyor.... (view fulltext now)

Tam metin

(1)

ii

ACKNOWLEDGEMENTS

All praise and glory to almighty ALLAH, the lord of the universe, who is the entire source of all knowledge and wisdom endowed to mankind. All thanks are due to him who gave me the ability and patience throughout my studies for completing this task.

I would like to thank my thesis supervisor PROF. DR.DOĞAN İBRAHIM for his intellectual support, encouragement and enthusiasm which made it possible to accomplish this thesis. I appreciate his most gracious encouragement and very valued constructive critics given to me throughout my education.

I would like to acknowledge the supports of my MOTHER AND FATHER (ASSOC.PROF.DR FAE'Q RADWAN) who have brought all of their efforts to support me, without knowing the return, and who have patiently encouraged me to be the best everywhere.

My special thanks goes to NEU educational staff, especially to computer engineering teaching

staff for their generosity and special help and support given to me throughout my studies at the

NEU.

Referanslar

Benzer Belgeler

Rahib Abiyev, my supervisor and the chairman of Computer Engineering Department at NEU, who helped me for all the information that I need, who his door was always open to help me in

Özerdem (Vice Chairman - Electrical and Electronic Engineering) for their great support during my undergraduate and graduate studies.. My deepest gratitude goes to my family for

9 Physical experiment: In snapshot (1) the robot explained human that the stamp is too close to you, it will be safer if she can stamp the table; (2) the robot continues with the

twin room çift kişilik triple room üç kişilik?.

In general, our problem is denoted as Resource Constrained (Multi-) Project Scheduling Problem with Weighted Earliness Tardiness (RC(M)PSPWET ) in the literature and defined as

Speranza and Vercellis [3] distinguished between a tactical and operational level in project scheduling where in tactical level higher management sets due date of projects and

These data indicate that PMC-A induced apoptosis is mediated by caspase dependent pathways, activation of JNK and p38 but not ERK 1/2 may have a pro-survival role.Finally our

UPGMA graph and genetic similarity coefficient values of the AFLP analysis indicated that Urla karası 4 and Urla karası 5 belong to grapevine accessions certainly different